Buwatuwa Secondary School ·
A secondary school for Buwatuwa
A new secondary school has gone up in Buwatuwa: four classrooms, an administration block with library and laboratory, a hall with kitchen and a latrine block. It was handed over in March 2026 – and has been in full use ever since.
- Built
- 2025/26
- classrooms
- 4
- Funded by
- BINGO Environmental Foundation Lower Saxony
The handover
In March 2026 the buildings and their furniture were handed over to the school's Board of Governors. Karsten Wolpers, our chairman, and members of the Freundeskreis were there, together with parents, teachers and representatives of the church.
As a sign of thanks, the Anglican bishop gave a goat. As agreed, it will go to a widow and her children near Butiru.
Cutting the ribbon. Guests from Germany, school board, parents and teachers. The goat – a thank-you from the bishop.
What was built
At the heart of it is the block with four classrooms, furnished with desks. In the administration building, the head teacher, the school office and the teachers finally have enough weatherproof rooms – plus a library and a laboratory, which pupils and teachers explored straight away.
The hall isn't only for school assemblies. It is also the dining room and the exam room for the annual national exams of the secondary school and the primary school next door. A kitchen with a store is built onto the hall, with two energy-saving stoves: pupils and teachers now regularly get breakfast porridge and a good lunch.
There is also a latrine block with four toilets and an extra urinal for the boys.
Lessons in the new classroom. The library. The laboratory. The hall – also dining room and exam room. Lunch from the new kitchen. The staff room. The head teacher's office.
A chance for the area's young people
From next year, up to 80 new pupils are expected every year. They come from the surrounding primary schools and have qualified for secondary school with their Primary Leaving Exam.
Most parents in this remote area are smallholders living from hand to mouth. They cannot afford fees for distant, expensive boarding schools. The fees in Buwatuwa are affordable and already include porridge and lunch – and they can be paid in instalments or even in kind.
How it was built
As soon as the grant was confirmed, the school board, the church and the foremen from Butiru met in Buwatuwa, and work began. The old school building was pulled down.
For the walls, trenches about one metre deep were dug first, filled with stones, covered with concrete and built up to foundation level. The latrine pit got a concrete cover, and the walls went up on top of it.
By the end of January all three buildings – administration, classroom block and hall – had reached ring-beam height. By mid-February the ring beams and gables were finished and the roofers could start. Master mason Paul Wefafa from our team in Butiru led the work.
Digging for the latrine block. Foundations of stone and concrete. The walls go up. End of January: administration with laboratory and library. The four-classroom block. Hall with kitchen and store. Master mason Paul Wefafa. Mid-February: the roofs go on. The finished latrine block.
Three valleys and a lot of receipts
The road for the building materials runs through three valleys. On rainy days the lorry often had to be half unloaded and the rest fetched later – sometimes only pushing helped.
Sand, aggregate and bricks are bought from local suppliers. Many of them have no receipts of their own and sign with an initial or a fingerprint. Prices change with the seasons: bricks cost more in the rainy season, when drying and firing them is harder, while river sand costs more in the dry season, when the rivers wash up less.
Finished: the front. And the back.
Thank you
On behalf of the school board, the church, the village community of Buwatuwa and the surrounding primary schools, we warmly thank the BINGO Environmental Foundation Lower Saxony and everyone who made this school possible. Young people who have finished primary school can now go on to secondary school – in weatherproof buildings, with a library and a laboratory.
Report by Elisabeth Mwaka